FAL – 2nd Quarter

It’s that time again, the time to fess up and bring out all the WIP’s to link to Leanne of She Can Quilt‘s Finish-A-Long list. My list for the first quarter was filled with small things like a sewing kit and some cushions which I managed to finish and one quilt which I didn’t even get out of the drawer it’s been banished to. So, as you can imagine it’s going on this quarter’s list. Right, here’s my list for this quarter:

1. Little Miss Bossy-Boots’ log cabin quilt.

Pink Log CabinsI’ve got four log cabins so far and will have to make at least another sixteen, I think. I’m not sure I have enough fabric so I might have to be a little creative and add some sashing to make the quilt big enough.

2. The Spring Carnival quilt. This is quite ambitious but I really want to bring it to the Fat Quarterly Retreat in July.

Spring Carnival ProgressMy biggest problem here is that I’m fast running out of the stripy fabric I’m using for the ‘background’. I believe I have enough for two more columns, then I have to decide whether to keep it that size or choose a different fabric and add a frame around the stripes.

3. Master’s Bag

Master's Bag

I promised to make this bag last year (hangs her head in shame) and only started a very short while ago.  I know it won’t take too long to make, I just need some uninterrupted sewing time which isn’t easy with Little Miss Bossy-Boots on holiday.

4. The Spring Version and Blossom panels.

Réalt Glas, Spring and BossomI’m not sure what to make with those two. I was wondering if I should turn one of them into a small quilt for the couch by adding a few borders and maybe making a bag with the other. Or maybe another cushion? Watch this space as I’m not sure yet what to do.

5. In The Woods

In the Woods FinishedTote pocket or doll blanket? The jury’s still out.

I think I’m going to stop here as I’d really like to finish everything on the list and there’s more than enough on there to keep me busy. Also, I know myself well enough that I’m sure I will start many new projects.

 

 

 

 

3 thoughts on “FAL – 2nd Quarter

Leave a Reply

Your email address will not be published. Required fields are marked *